Till date, very few attempts have been made to harness wind energy in Nepal. The first initiative was taken back in 1989, when two turbines of 10 kW were installed in Kagbeni, Mustang. Within three months of installation, the turbine blades were blown away by the gusty wind and sadly the project met an untimely end. After that, a few projects of small scale have been added to the list, latest being funded as a Renewable Village project by ADB in Nawalparasi where two sets of 5 kW wind turbines have been installed. Success of any wind project depends on the processes that are used during the project management.